Sealer IQ, OQ and PQ Under ISO 11607-2: Validating the Sealing Process

2 days ago
7 min read

Reviewed by Aaron Lyon, President of A.P. Lyon and former Director of Quality Assurance and International Regulatory, with more than 30 years in medical device quality. Last reviewed November 24, 2026.


A new pouch sealer arrives, the supplier sets it up, and the team is ready to run OQ. Then the auditor asks for the installation qualification and the process specification, and neither exists. It is one of the most common gaps in sterile packaging files. ISO 11607-2 does not treat OQ and PQ as the whole validation. It asks for a process specification, an IQ, an OQ and a PQ in that order, then a formal approval, then routine control and change management.


This guide explains what ISO 11607-2:2019 with Amendment 1:2023 requires at each step for forming, sealing and assembly processes, with a focus on heat sealers. Each summary is in our own words.


Which processes need validating


ISO 11607-2 clause 5.1 covers the processes that make preformed sterile barrier systems and sterile barrier systems. Examples are pouch forming and sealing, form-fill-seal, tray and lid sealing, kit wrapping and fluid-path assembly. ISO 13485:2016 clause 7.5.7 says the same thing from the quality system side: processes for sterile barrier systems are validated under documented procedures before they are used, and after product or process changes as appropriate.


If you seal pouches on a bar sealer, seal lids to thermoformed trays, or form and seal pouches on a band or 4-side sealer, the process is in scope.


Start with process development and risk


Validation goes faster and is more defensible when development comes first. Informative Annex A of ISO 11607-2 describes what to do before validation: identify the process elements, the variables and attributes to monitor with their action limits, and the variables to control, with their operating ranges, settings and tolerances. Upper and lower limits are set well away from failure or marginal conditions. Seal-strength curves with visual examples help, and so do a failure mode analysis and statistically designed experiments. For heat sealing, the variables usually include temperature, contact pressure, dwell time or line speed.


Since Amendment 1:2023, clause 4.2 and normative Annex B also require a documented risk management process for each forming, sealing and assembly process. The analysis covers microbial contamination, chemical contamination, adverse environmental and processing conditions, and misleading information, under normal and fault conditions. Risk controls follow the required order: process development or design change first, then process controls such as monitors, alarms, in-process checks and fixtures, and only then operator information and output inspection. Meeting the validation acceptance criteria is how you verify that the controls work.


The process specification


Under clause 5.1, each forming, assembly or sealing process has a process specification. It states the required output, the variables and attributes monitored to keep the process in control and capable, and the parameters controlled to make that output. Data from earlier validations of existing products may be used to set parameter tolerances.


Older documents often call these "critical process parameters." The 2019 edition no longer uses that term. The process specification is the document the IQ is written against, so it must exist before installation qualification starts.


Installation qualification (IQ)


Clause 5.2 sets out what the IQ covers. At a minimum it addresses every element in the process specification, and it considers:


  • equipment design features and installation conditions such as wiring, utilities and functions;

  • safety features, and operation within the design parameters;

  • supplier documents, drawings, manuals and spare-parts lists;

  • software or firmware validation;

  • environmental conditions such as cleanliness, temperature, humidity and lighting;

  • documented operator training, and an operating manual or procedure.


The IQ also includes tests and checks:


  • the process variables can be controlled as specified;

  • monitoring functions are checked or certified in place;

  • alarms, warnings and machine stops are challenged for out-of-limit variables;

  • instruments, sensors, displays and controllers are calibrated, with written calibration schedules;

  • written preventive maintenance and cleaning schedules exist;

  • software used in the process is validated.


A practical test: if your sealer displays a temperature, has the thermocouple been checked against a calibrated reference at the seal bar? If it has an alarm for low pressure, has someone actually dropped the pressure to see the alarm and the machine stop? Those are IQ items, and they are the ones most often missing.


Operational qualification (OQ)


Clause 5.3 says the OQ challenges the process variables to find the upper and lower limits that still make conforming product, and shows that product made at both limits meets the specification. For sealing, the quality properties considered are seal strength, an intact seal over the specified width, no channels or open seals, no punctures or tears, and no delamination in seals that are meant to be peeled open. For forming or assembly, they are complete formation, product fit and essential dimensions.


The OQ is where the sealing window is proven. Typical OQ work on a heat sealer runs the low and high corners of temperature, pressure and dwell, and tests seals made at each condition for seal strength and seal integrity. The test methods used must themselves be validated, as ISO 11607-2 clause 4.4.3 requires.


Performance qualification (PQ)


Clause 5.4 says the PQ shows the process consistently meets requirements under expected operating conditions. It:


  • uses actual or simulated contents, unless a rationale shows they are not needed;

  • runs at the nominal parameters established in OQ;

  • verifies product and package requirements;

  • shows control, capability, repeatability and reproducibility;

  • challenges conditions expected in manufacturing, such as set-up, change-over, start-up and restart, power variation and multiple shifts;

  • includes at least three production runs, so that both within-run and between-run variation are assessed;

  • uses the documented procedures or process specification, and monitors and records the specified variables.


The three-run minimum is a frequent finding. So is a PQ that runs only on the day shift with one operator, which does not show reproducibility.


Approval of the validation


Clause 5.5 makes the final step a documented review and formal approval. The validation report summarizes and references all the protocols and results and states the conclusion on the validation status of the process. Without that signed conclusion, the process is not validated, however good the data are.


Routine monitoring and control


Clause 5.6 requires procedures that keep the packaging process in control and within the established parameters in routine production. The specified process variables are monitored routinely and records are kept. In practice that means recording the actual sealing parameters for each lot and running routine seal tests, such as seal strength and visual inspection, at a defined frequency.


Change control and revalidation


Clause 5.7 places forming, assembly, sealing and closing processes under change control. Changes are documented, verified and authorized, and the change review includes a check for revalidation. Revalidation is needed when a change compromises the original validation. Examples in the standard include:


  • raw material changes that affect process variables;

  • change or exchange of a main part of the equipment;

  • modification or refurbishment of the equipment;

  • moving the process or equipment to another site, or within the site;

  • negative trends in quality or process control.


New equipment needs a new validation, not a revalidation. The need for revalidation is evaluated and documented, and the revalidation can be narrower than the original. Minor changes are recorded too, because several of them can add up to a change that matters.


On the packaging system side, ISO 11607-1 clause 8.2 gives one helpful relief: new sealing equipment with equivalent technology does not need new distribution performance testing, as long as its process is validated and the seals meet the original package specification.


Assembly conditions


Clause 6 adds requirements around the process: sterile barrier systems are assembled in environmental conditions that limit contamination risk to the device, and assembly follows controlled labelling and processing procedures that prevent mislabelling.


A worked example: a new bar sealer for pouches


  1. Process specification. The packaging engineer writes the specification: seal width, minimum and maximum seal strength, no channels, and the controlled parameters (temperature, pressure, dwell) with tolerances taken from development work.

  2. Risk assessment. The team lists process hazards, such as a cold spot on the seal bar causing a channel, and the controls: a temperature alarm, a calibrated thermocouple and visual inspection of each seal.

  3. IQ. The installation qualification records utilities, manuals and spare parts, calibrates the temperature, pressure and timer readouts, challenges the low-temperature and low-pressure alarms, confirms preventive maintenance and cleaning schedules, and records operator training.

  4. OQ. Seals made at the low and high corners of the window are tested for seal strength and integrity. All results meet the specification.

  5. PQ. Three production runs at nominal settings, on two shifts, with a restart after a stop, show the process is capable and repeatable.

  6. Approval. The validation report references the IQ, OQ and PQ and states that the process is validated.

  7. Routine control. Each lot record captures the actual parameters and the routine seal test results.


How the A.P. Lyon documents fit


The Sterile Packaging Validation Kit has the Packaging Process Validation and Control Procedure, the Sealer Installation Qualification Protocol and Report, the packaging risk management plan and assessment, test method validation, routine seal strength and package integrity testing, and change and revalidation assessment. For the OQ and PQ test work, use the Bar Sealer, Tray Sealer or 4-Side Seal Pouch qualification protocols, which start where the kit's IQ ends.



Frequently asked questions


Is an IQ required for a package sealer?


Yes. ISO 11607-2 clause 5.1 requires forming, sealing and assembly processes to be validated with IQ, OQ and PQ in that order, and clause 5.2 sets out what the installation qualification covers, including calibration, alarm challenges, maintenance schedules and software validation.


How many PQ runs does ISO 11607-2 require?


At least three production runs, so that both within-run and between-run variation are assessed (clause 5.4).


Does moving a sealer to another room need revalidation?


It needs an evaluation. ISO 11607-2 clause 5.7 lists moving the process or equipment within the site or to another site as an example of a change that can compromise the original validation. The need for revalidation is evaluated and documented, and the revalidation may be narrower than the original.


Building a complete quality system? Build Your QMS lets you choose ISO 13485 + FDA QMSR, Dual-Standard or ISO 9001:2026 procedures in one place, and applies volume discounts automatically: 20% off 5–9 procedures, 35% off 10–19, 50% off 20–39 and 60% off 40 or more.


Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.

Comments