QMS Budget Planner: what a quality system costs and how long it takes

Compare the cost and time of four ways to set up an ISO 13485, ISO 9001 or food safety quality system, then get a one-page budget memo for your CEO or CFO.

Free, with no sign-up. Nothing you enter is stored or sent anywhere. Not sure which documents you need yet? Start with the free Startup Quality Plan.

How much does a QMS cost?

The cost of a quality management system (QMS) comes from three things: the cash you spend on documents or outside help, the staff time it takes to write or adapt the procedures, and the weeks it takes to implement the system and train your people. The planner adds up all three for each route, so you can compare them side by side.

The number of procedures drives most of the cost. A medical device company that is just starting out may begin with about 23 procedures, while a company that designs, develops and manufactures devices typically needs more than 70. Writing one procedure from scratch takes an in-house team about 12 hours, so 73 procedures is roughly 876 hours of staff time before implementation even starts.

Four ways to set up a quality system

QMS Budget Planner questions

Is the QMS Budget Planner free?

Yes. There is no sign-up, and nothing you enter is stored or sent anywhere.

Which standards does it cover?

ISO 13485 with the FDA QMSR, dual ISO 13485 and ISO 9001, ISO 9001:2026, and ISO 22000 and FSSC 22000 food safety. A Custom QMS is not offered for food safety, so food safety shows three routes.

What does the memo show?

Cash cost, staff time, total cost and time to implement for each route, whether each route meets your target date, a timeline, a recommendation and the assumptions used.

Can I change the numbers?

Yes. Enter your own internal cost per hour and consultant rate. The memo shows every assumption, so your CFO can see how the figures were built.

Does the timeline include certification?

No. The times are to an implemented system. An auditor needs evidence that the system is in use, so plan on about 2 to 3 months of operating records before the certification audit. That is the same for every route.

How do I share the memo?

Print it or save it as a PDF, email it to your CEO, or copy a short summary into a message.

Go straight to Build Your QMS and pick the procedures yourself.

What if I already know what I need?

Write it in-house from scratch. There is no cash cost, but it takes the most staff time and the longest timeline.

Hire a consultant to write it. Your team spends less time writing, but you pay consultant fees of about 4 hours per procedure at the consultant's rate ($175 an hour by default).

Adapt A.P. Lyon documents. Buy a complete system of editable Word and Excel documents, then spend about 1 to 2 weeks, and no more than 40 staff hours, editing them for your organization, titles and responsibilities.

Get a Custom QMS. Answer questions about your company and receive a complete system written for you in about 10 business days, already structured for your organization and roles. Available for ISO 9001, ISO 13485 and dual-standard systems.

For example, a part-time team putting in place ISO 13485 and the FDA QMSR for design, development and manufacturing (73 procedures) would spend about $65,700 in staff time and 65 to 70 weeks writing the system in-house. With A.P. Lyon documents or a Custom QMS, the same team would spend about $3,450 to $5,795 and 11 to 17 weeks.

How long does QMS implementation take?

Time depends mostly on how dedicated your team is. A fully dedicated team can implement the system and train staff in about 4 to 6 weeks. A team working on it part-time, alongside their current jobs, typically takes about two and a half times as long. The planner adjusts every route for the level of dedication you choose and shows whether each route meets your target date.

Certification takes longer than implementation. An auditor needs evidence that the system is in use, not just in place, so plan on about 2 to 3 months of operating records before the certification audit. That is the same for every route.

Where the numbers come from

Prices and procedure counts come straight from the A.P. Lyon store. Hours per procedure, consultant rates and implementation times were set by Aaron Lyon, former Director of Quality Assurance and International Regulatory, and checked against published industry figures. Every assumption is printed on the memo, and you can change the internal and consultant rates to match your company.

Who it's for

Quality and regulatory managers who need to put a budget and a timeline in front of management, and founders deciding how to build their first quality system.