Design Controls Step by Step Under ISO 13485 and the FDA QMSR: Which Devices, Which Records, In What Order
Reviewed by Aaron Lyon, President of A.P. Lyon and former Director of Quality Assurance and International Regulatory, with more than 30 years in medical device quality. Last reviewed November 27, 2026.
Most device teams know the words: plan, inputs, outputs, review, verification, validation, transfer, changes, design file. Fewer can say, at any moment of a project, which of those records exist, which are missing and what has to happen next. That is the gap an auditor or an FDA investigator finds, and it is usually a gap in the order of work, not in the procedure.
This guide sets out design control as a route, in the order the work is usually done, with who does each stage and what "done" looks like. Each summary of a requirement is in our own words. For design inputs and traceability in detail, see Design Inputs and the Trace Matrix. For the end of the project, see Design Verification, Validation and Transfer Under ISO 13485.
Which devices need design controls
Under the FDA Quality Management System Regulation, 21 CFR 820.10(c) requires manufacturers of class II and class III devices to comply with ISO 13485 clause 7.3 and all of its subclauses. The same applies to two groups of class I devices: devices automated with computer software, and the five devices listed in table 1 to paragraph (c)(2). Those five are the tracheobronchial suction catheter (21 CFR 868.6810), the non-powdered surgeon's glove (878.4460), the protective restraint (880.6760), the manual radionuclide applicator system (892.5650) and the radionuclide teletherapy source (892.5740).
Outside the US, a company certified to ISO 13485 applies clause 7.3 to the design and development it does, unless its quality manual records a justified exclusion.
The first practical step is to write the decision down for each device: its class in each target market, whether design controls apply, and why. That one record answers a question that otherwise gets asked again at every audit.
Who does the work
Management Board: approves the project, provides resources and authorizes release.
Project Leader: keeps the plan and the trace matrix current, calls the design reviews and compiles the design file.
Project Team: the cross-functional team that writes the inputs and outputs and runs verification and validation.
Regulatory Affairs: decides whether design controls apply and lists the regulatory requirements and standards for each market.
Quality Assurance: approves the plan, inputs, protocols and reports, and approves design changes.
Independent Reviewer: a person at each design review with no direct responsibility for the stage being reviewed.
Stage 1: Plan the project
ISO 13485 clause 7.3.2 asks for planning documents that are kept up to date as the work moves on. The plan records the stages, the reviews at each stage, the verification, validation and transfer activities suited to each stage, responsibilities and authorities, how outputs will be traced back to inputs, and the resources needed, including the competence of the people.
In practice, the plan is also the place to record the interfaces: the groups inside the company, the contract services, suppliers and customers involved, and what passes between them. Done when: the plan is approved, and the team knows what each stage must deliver.
Stage 2: Set the design inputs
Clause 7.3.3 lists what the inputs must cover: functional, performance, usability and safety requirements for the intended use; the regulatory requirements and standards that apply; the outputs of risk management that apply; information from earlier similar designs where useful; and other requirements essential to the design of the product and its processes. The inputs are reviewed for adequacy and approved, and each requirement must be complete, unambiguous, able to be verified or validated, and free of conflict with another.
Most teams find it easiest to write user needs first, in the user's words, and then turn each one into design input requirements with acceptance criteria. Done when: the inputs are approved at a design input review.
Stage 3: Write the design outputs
Under clause 7.3.4, outputs must meet the inputs, give the information needed for purchasing, production and service, contain or reference the product acceptance criteria, and state the characteristics essential for safe and proper use. They are approved before release and kept as records.
Mark the essential characteristics on the drawings and specifications, so that production and inspection control them. Done when: each input has a released output linked to it.
Stage 4: Review the design at each stage
Clause 7.3.5 asks for systematic reviews at suitable stages, under planned and documented arrangements, to judge whether the results can meet requirements and to propose needed actions. Participants include representatives of the functions concerned with the stage and other specialists. The record names the design under review, the participants and the date, with the results and actions.
A review is only as good as what is put in front of it. Send the results against the requirements, the traceability gaps and the risk status beforehand, and end with a recorded decision: move on, move on with conditions, or stop.
Stage 5: Verify the design
Under clause 7.3.6, verification shows that outputs meet inputs. Verification plans state methods, acceptance criteria and, where appropriate, statistical techniques with the reasoning for sample size. Where the device must connect or interface with other devices for its intended use, verification includes them. ISO 14971 adds that each risk control is verified as implemented and as effective.
Stage 6: Validate the design
Under clause 7.3.7, validation shows that the product meets the requirements for its intended use. It uses representative product, meaning initial production units, batches or their equivalents, and the reason for the choice is recorded. It includes clinical or performance evaluation as regulations require, and it is finished before the product is released to the customer.
Stage 7: Transfer the design to manufacturing
Clause 7.3.8 asks for documented procedures that make sure outputs are verified as suitable for manufacturing before they become final production specifications, and that production capability can meet product requirements. The results and conclusions are recorded.
Stage 8: Release, keep the design file and control changes
Before release, ISO 14971 asks for a review, by people with the authority named in the risk management plan, that the plan was carried out and the overall residual risk is acceptable. The result is the risk management report.
Clause 7.3.10 asks for a design and development file for each device type or family that includes or references the records showing conformity to the design requirements and the records of design changes. Clause 7.3.9 asks that every design change is identified, reviewed, verified, validated as appropriate and approved before it is put into effect, with its significance to function, performance, usability, safety and regulatory requirements determined, and its effect on parts, product in process or already delivered, and risk management assessed.
Putting it into practice
The Design Control Kit turns this route into three procedures and nine forms, written as numbered steps with an owner and a record for each. It includes a design and development plan that starts with the 21 CFR 820.10(c) decision, a design input requirements form with a requirement check, an Excel trace matrix that flags its own gaps, review, verification and validation forms, a transfer checklist, a change impact assessment and a design file index. It works with the Design Control Procedure and does not replace it.
Frequently asked questions
Is a class I device ever under design controls in the US?
Yes. Class I devices automated with computer software, and the five class I devices listed in 21 CFR 820.10(c)(2), must meet ISO 13485 clause 7.3.
Is the design and development file the same as the design history file?
It does the same job. ISO 13485 clause 7.3.10 calls it the design and development file; many companies, and many existing procedures, call it the design history file (DHF).
Do we need a separate review for every stage?
The standard asks for reviews at suitable stages under planned arrangements. The plan says which stages, and the record of each review shows it happened.
Building a complete quality system? Build Your QMS lets you choose ISO 13485 + FDA QMSR, Dual-Standard or ISO 9001:2026 procedures in one place, and applies volume discounts automatically: 20% off 5–9 procedures, 35% off 10–19, 50% off 20–39 and 60% off 40 or more.
Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.
Just getting started? The free Startup Quality Plan shows which procedures you need now, which can wait, and how long they take to put in place.



Comments