Ask three food safety professionals to explain the difference between validation and verification and you may get three answers. The confusion matters. Auditors regularly raise nonconformities because a facility has verification records but no validation, or because a monitoring check has been described as verification.
The distinction is simple once it is stated clearly:
Validation asks: will this control work, if we do it as designed?
Monitoring asks: are we doing it as designed, right now?
Verification asks: did it work, and are we doing everything we said we would?
This guide explains each term as Codex, ISO 22000 and the FDA's Preventive Controls for Human Food rule use them, then works through examples and the records you need.
The definitions
The Codex Alimentarius General Principles of Food Hygiene (CXC 1-1969, revised 2020) define the terms that ISO 22000 and most schemes build on. Paraphrased:
Validation of control measures: obtaining evidence that a control measure or combination of control measures, if properly implemented, is capable of controlling the hazard to a specified outcome.
Monitoring: conducting a planned sequence of observations or measurements of control parameters to assess whether a control measure is under control.
Verification: applying methods, procedures, tests and other evaluations, in addition to monitoring, to determine whether a control measure is or has been operating as intended.
ISO 22000:2018 uses closely aligned definitions in clause 3. Check the exact wording against your licensed copy.
Validation in ISO 22000
Clause 8.5.3 requires the food safety team to validate that the selected control measures are capable of achieving the intended control of the significant food safety hazards. Validation must be performed before implementation of control measures and combinations of control measures to be included in the hazard control plan, and after any change to them.
When validation shows a control measure is not capable of achieving the intended control, the food safety team must modify and re-assess the control measures. The validation methodology and evidence must be maintained as documented information.
Validation under FSMA
Under 21 CFR 117.160, validation is required for process controls, such as cooking, cooling, acidification and drying, and for other preventive controls unless a written justification is prepared. The rule specifically states that validation is not required for:
Food allergen controls
Sanitation controls
The recall plan
The supply-chain program
Validation must be performed by, or overseen by, a Preventive Controls Qualified Individual. It must be done:
Prior to implementation of the food safety plan or, when necessary, within 90 calendar days after production of the applicable food first begins, or within a reasonable timeframe justified in writing by the PCQI
Whenever a change to a control measure or combination of measures could affect whether it will effectively control the hazards
Whenever a reanalysis of the food safety plan reveals the need
Validation must include obtaining and evaluating scientific and technical evidence, or, when that is not available or adequate, conducting studies to determine that the preventive controls are capable of effectively controlling the hazards.
What counts as validation evidence
Validation evidence typically comes from one or more of:
Scientific literature and regulatory guidance, such as FDA's published time and temperature tables for pathogen reduction
Process authority studies, for example for acidified or low-acid canned foods
Challenge studies that inoculate product with a target organism or surrogate and measure reduction
Industry validation data, where the conditions match your process
In-plant studies, such as heat penetration and temperature distribution studies for an oven or cooling profile studies for a chiller
The key is that the evidence must match your conditions: your product, your equipment and your worst case. A published lethality table is only valid if your product actually reaches the time and temperature it assumes at its coldest point.
Monitoring
Monitoring is the routine check that the control is operating within its limits. Under 21 CFR 117.145, monitoring procedures must be written, with a frequency adequate to assure that the preventive control is consistently performed, and must be documented in records. Under ISO 22000, monitoring at CCPs and OPRPs is part of the hazard control plan in clause 8.5.4.
Monitoring is performed by operators as part of production. It produces the results that trigger corrections and corrective actions.
Verification
Verification checks that the system is working as planned and producing safe food. ISO 22000 clause 8.8 requires a verification plan that covers whether prerequisite programmes are implemented and effective, whether the hazard control plan is implemented and effective, whether hazard levels are within acceptable limits, whether the inputs to the hazard analysis are kept up to date, and whether other actions are implemented and effective. Verification must not be performed by the person responsible for monitoring the same activity. Results must be analyzed under clause 8.8.2.
Under 21 CFR 117.165, verification activities include, as appropriate to the facility, the food, and the nature of the preventive control:
Validation of process controls
Verification that monitoring is being conducted
Verification that appropriate decisions about corrective actions are being made
Calibration of process monitoring and verification instruments
Product testing for a pathogen or appropriate indicator organism
Environmental monitoring, where an environmental pathogen is a hazard requiring a preventive control
Records review: monitoring and corrective action records reviewed by, or under the oversight of, a PCQI within seven working days after the records are created, unless a longer timeframe is justified in writing; calibration, testing and supplier verification records reviewed within a reasonable time
Reanalysis of the food safety plan
Worked example 1: a cooking step
A ready meal is cooked in a continuous oven to control Salmonella and Listeria monocytogenes.
Validation: a heat penetration study shows that, at the validated belt speed and oven setpoint, the coldest product in the worst-case loading reaches the target time and temperature from published FDA guidance. The study covers the largest product size and the fastest belt speed. The PCQI reviews and approves the study before routine production.
Monitoring: operators check and record the oven temperature and belt speed every 30 minutes, and probe the product core temperature at the start of each run and every two hours.
Verification: the supervisor reviews monitoring and corrective action records daily and the PCQI within seven working days; thermometers and the oven's temperature sensor are calibrated monthly; finished product is tested for indicator organisms monthly.
Worked example 2: allergen changeover cleaning
A line runs a milk-containing product, then a dairy-free product.
Validation: not required under 21 CFR 117.160 for allergen controls, but strongly recommended. Allergen-specific swabs after three changeovers show no detectable milk protein at defined sites.
Monitoring: after each changeover, the operator completes a visual inspection checklist and the supervisor signs off before the next run starts.
Verification: weekly allergen-specific swabs at the hardest-to-clean sites, review of changeover records, and an annual internal audit of allergen controls.
Our allergen management program guide explains changeover validation in more detail.
Worked example 3: an OPRP for metal detection
Metal detection is managed as an OPRP with action criteria.
Validation: test pieces of the defined size and material are reliably rejected when passed through the detector at the worst-case position in the product, at production speed, with the reject mechanism working.
Monitoring: operators pass test pieces through the detector at start-up, every hour and at the end of the run, and record the results.
Verification: the supervisor reviews monitoring records each shift; the detector is serviced and its sensitivity checked by the supplier annually; reject bin contents are reviewed.
Revalidation triggers
Revalidate when anything that could affect the control's capability changes, including:
New product, formulation or pack size
New or modified equipment
Changed process parameters, such as faster line speed
New scientific information about the hazard
Repeated verification failures or a food safety incident
Common audit findings
Verification records but no validation. Temperatures are monitored and reviewed, but nothing shows the setpoint is lethal for the product.
Validation that does not match the process. A study covering a smaller product or slower speed than current production.
Monitoring described as verification. An operator's hourly check recorded as a verification activity.
The same person monitoring and verifying, contrary to ISO 22000 clause 8.8.
Records review late. PCQI review of monitoring records outside the seven working day window without justification.
No revalidation after change. A new oven or line speed with no new validation.
Documents that help
A.P. Lyon's Validation of Control Measures Procedure ($99) covers when validation is required, acceptable evidence, study planning, PCQI review and revalidation triggers. The Verification Planning and Activities Procedure and the Analysis of Verification Results Procedure cover clause 8.8 and 21 CFR 117.165, and the Monitoring and Corrections at CCPs and OPRPs Procedure covers routine monitoring.
All of them are part of the Food Safety Management System, Complete ($1,295), and you can choose individual procedures in Build Your QMS with volume discounts.
Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.
Just getting started? The free Startup Quality Plan shows which procedures you need now, which can wait, and how long they take to put in place.
The documents need to be adapted to your products and processes, and a PCQI or other qualified person should review your validation studies. They are documentation, not validation or certification.
Next steps
See how environmental monitoring works as a verification activity in our environmental monitoring program guide, read HACCP Plan vs FSMA Food Safety Plan, or contact A.P. Lyon about consulting for help planning validation studies.



Comments