PRP Verification Inspections: How to Score Them and Track Findings
Reviewed by Aaron Lyon, President of A.P. Lyon and former Director of Quality Assurance and International Regulatory, with more than 30 years in medical device quality. Last reviewed November 27, 2026.
Most food sites walk their areas with a GMP or PRP checklist. Far fewer can answer the questions an auditor asks next: how did the packing hall score last quarter, which findings are still open, and why has the same door seal failed three times? A PRP verification inspection is only worth doing if its results are scored the same way every time and every finding is closed and checked. This guide sets out a course of action for both.
Every summary of a standard here is in our own words. For what the PRP requirements themselves cover, see ISO 22002-100:2025 and ISO 22002-1:2025: What the Prerequisite Programme Requirements Cover.
What the standards ask for
ISO 22000:2018 clause 8.8 asks for verification activities planned with a purpose, method, frequency and responsibility, confirming among other things that PRPs are implemented and effective. The person who verifies an activity must not be the person responsible for monitoring it, and results are kept and communicated.
FSSC 22000 Version 7 adds, in requirement 2.5.12, routine risk-based site inspections or PRP checks, for example monthly, with defined sampling criteria, to verify that the site, environment and equipment stay in suitable condition.
Neither standard tells you how to score an inspection or how fast to close a finding. That is for your own procedure to set, and the rest of this guide shows one way to do it.
Step 1: List the areas and set frequencies
List every area to inspect, not just production: raw material and packaging stores, docks, utilities rooms, changing rooms, toilets and canteen, the grounds and the roof access. Give each area a frequency based on its risk. In our food safety system, the default is weekly for production, packing and high-care areas, monthly for stores, utilities and employee facilities, and quarterly for a cross-functional walk of the whole site.
Rotate inspections across shifts, and plan at least some during sanitation or a product changeover. Conditions at 6 a.m. on a Monday are not the same as at the end of a night shift.
Step 2: Fit the checklist to the site
Write the PRP requirements as items an inspector can see on the day, grouped by PRP element: site and buildings, layout, storage, utilities, pest control, waste, equipment, receiving, transport, zoning, allergens, physical and chemical contamination, cleaning, hygiene facilities, behaviour, visitors, product information, food defence and rework.
Mark any item that does not apply at the site, and record the reason. ISO 22002-100 allows an exclusion only with a sufficient justification showing it does not harm food safety.
Step 3: Inspect and mark every item
Walk the area with the checklist and mark each item OK, not OK or not applicable. Look at what people do as well as at conditions: hand washing, gloves, how product is handled. Leave an item blank only if you did not check it.
Make sure the inspector is not the person who monitors the same activity day to day. A sanitation lead should not be the only one verifying sanitation.
Step 4: Score the inspection the same way every time
The simplest score that holds up is:
Score = items OK / items checked
Items marked not applicable, and items not checked, are left out of both numbers. An inspection with 38 items OK out of 40 checked scores 95%. Set a target, for example 90%, and treat any inspection below it as a signal for the area owner.
Do not weight the score to hide a serious finding. A critical finding is handled on its own (see the next step), whatever the score.
Step 5: Rate every finding
Give every not-OK item a rating, an owner and a due date. The ratings used in our food safety system are:
Critical: an immediate risk of product contamination, such as condensate dripping onto open product, pest activity in a production area or broken glass near open product. Stop the area, hold product and correct the problem before restarting.
Major: a PRP failure that could lead to contamination if not corrected, such as a damaged floor in a wet area or empty hand-wash dispensers. Correct within 24 hours or apply a documented interim control.
Minor: an isolated lapse with no direct risk to product, such as untidy storage away from product. Correct within 7 days or by an agreed date.
Product held after a critical finding is evaluated under your nonconforming product procedure before any decision to release it.
Step 6: Close and verify
The owner records the action taken and the date it was done. Quality Assurance then goes and looks, and signs off the closure. Until that happens the finding is not closed, it is only awaiting verification. This is the step most sites skip, and it is the reason the same finding keeps coming back.
Step 7: Escalate the right findings
Some findings need more than a fix. Raise a corrective action when a finding is:
critical
a repeat: the same item has failed in the same area within a set window, for example 90 days
overdue: it passed its due date without being closed
A repeat finding is the clearest sign that a correction treated the symptom and not the cause.
Common mistakes
Inspecting only production areas. Stores, utilities and employee facilities have PRPs too.
Scores that cannot be compared because each inspector counts differently.
Findings with no owner or due date.
Closing findings on the owner's word without anyone checking.
No link between repeat findings and corrective action.
Putting it into practice
The PRP Verification Workbook does each step above in Excel: areas and frequencies, 74 check items under 20 PRP elements, a score for every inspection, a findings sheet that sets the due date from the rating, and flags for overdue findings, repeats and findings that need corrective action. It follows the inspection rules of our Prerequisite Programs Management Procedure and Verification Planning and Activities Procedure.
Frequently asked questions
How often should PRP verification inspections be done?
Set the frequency by risk. FSSC 22000 Version 7 gives monthly as an example of a routine inspection. Many sites inspect high-risk production areas weekly and lower-risk areas monthly or quarterly.
Is a GMP inspection the same as an internal audit?
No. An inspection checks conditions and practices in an area on the day. An internal audit checks that the PRP system, its procedures and records, works as planned. You need both.
What score should we aim for?
Set your own target and keep it the same over time so trends mean something. Our food safety system uses 90% or more, with no overdue critical findings. For what to do with the scores once you have them, see Using PRP Verification Results: Trends, the Quarterly Analysis and the Annual PRP Review.
Building a complete food safety system? The Food Safety Management System Complete includes a food safety manual, a food safety plan and HACCP workbook, 57 procedures and 104 forms, written to ISO 22000:2018, FSSC 22000 Version 7 and FDA 21 CFR 117.
Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.
Just getting started? The free Startup Quality Plan shows which procedures you need now, which can wait, and how long they take to put in place.



Comments