How to Write a Risk-Based Monitoring Plan for a Medical Device Clinical Investigation Under ISO 14155:2026
Reviewed by Aaron Lyon, President of A.P. Lyon and former Director of Quality Assurance and International Regulatory, with more than 30 years in medical device quality. Last reviewed November 28, 2026.
A clinical investigation is only as reliable as the oversight behind it. The monitoring plan decides what the monitor checks, how much source data is verified, how often the sites are visited and what happens when a site falls behind. Under ISO 14155:2026, that plan must come from the risk assessment of the investigation, not from a fixed visit schedule copied from the last study. This guide sets out a practical route for writing it.
The requirements below are summarized in our own words from ISO 14155:2026 and, for U.S. investigations, 21 CFR Part 812. Check the standard and the official text at www.ecfr.gov before relying on them.
What ISO 14155 requires of a monitoring plan
ISO 14155:2026 clause 6.7 requires the sponsor to set the extent and nature of monitoring from the risk assessment of the investigation. The factors named are the objective, the design, the complexity, the size, the critical data points and endpoints, and how far the investigation departs from routine clinical practice. This is risk-based monitoring.
The plan, with its supporting rationale, describes:
the risks of the investigation and the controls for them;
the processes to be monitored, including the data to be verified against source documents;
the monitoring methods (on-site, or on-site combined with centralized monitoring where justified);
the responsibilities;
the procedures for overseeing the investigation;
how monitoring results are documented and communicated;
how compliance is obtained;
the escalation process for continuous or egregious non-compliance;
the aspects that would compromise subject protection or data integrity if done wrongly;
the personal data protection requirements.
The plan is tailored to the stage of clinical development and the type of investigation. On-site monitoring is generally needed throughout; centralized monitoring can add to it. If the sponsor decides to omit source data verification, it must justify that decision in writing.
In the United States, an IDE application includes written monitoring procedures as part of the investigational plan (21 CFR 812.20(b) and 812.25), and the sponsor selects qualified monitors (21 CFR 812.43). Non-significant risk studies also require the sponsor to monitor.
Step 1: start from the risk assessment
The plan is built on three kinds of risk:
Device risks. These come from the risk management file under ISO 14971 and are evaluated for the investigation before it starts. ISO 14155 clause 6.2.2 asks for residual risks to be evaluated in proportion to the size of the investigation.
Risks of procedures the CIP requires outside routine clinical practice. ISO 14155 keeps these separate from device risks and manages them in the CIP (clauses 6.2.1 and 7.4.5).
Risks of the investigation process itself. New site teams, many sites, a complex visit schedule, an electronic data system that has not been used before, or a primary endpoint that depends on a measurement that is easy to get wrong.
List each risk in the plan with the control already in the CIP or the site process, and write down what monitoring must confirm. "Pump alarm failure" is a device risk whose control is the alarm check in the instructions for use; monitoring must confirm the check is done and every alarm failure is reported as a device deficiency.
Step 2: mark what would harm subjects or data
Clause 6.7 i) asks the plan to identify the aspects that, if done wrongly, would compromise the protection of subjects or the integrity of the data. In almost every device investigation these include:
informed consent, obtained on the approved version before any investigation procedure;
eligibility, because deviations from eligibility criteria are not permitted under ISO 14155 clause 5.6.4 b);
the primary endpoint data;
reporting of serious adverse events and device deficiencies that could have led to a serious adverse device effect;
investigational device accountability.
Mark these as needing special attention at every visit. They are also the items where full source data verification is easiest to justify.
Step 3: decide the extent of source data verification
For each critical process and data item, decide how much is verified against source documents: every record, a sample, or centralized review only. Write the decision and the reason. A useful rule is that the extent follows the consequence: full verification for consent, eligibility, the primary endpoint and serious safety reports; a sample for secondary data; centralized review for data that is checked in other ways.
If you decide to omit source data verification for any item, clause 6.7 requires a written justification. The plan must then show the controls that take its place, such as documented investigator training, meetings, extensive written guidance or telephone contact, and well-defined processes for site record keeping, data entry and reporting.
National rules on personal data protection can limit how a monitor accesses source data, so record them in the plan.
Step 4: choose the methods and the frequency
Record how each site will be initiated (a visit, an investigator meeting or, where the plan justifies it, a remote initiation), how often routine visits will happen, what centralized review will cover and how close-out will be done.
ISO 14155 gives examples of centralized monitoring activities: examining data quality, remote contact with the site, EC renewals, adverse event review, DMC review and device accountability. Centralized review works well between visits for the adverse event log and the deviation log, because it finds late reports and patterns across sites while there is still time to act.
Set frequency by risk and by activity. A visit after the first few subjects at a new site catches misunderstandings early. After that, the interval can follow enrollment rate and findings. Write down what changes the frequency, so that a site with repeated findings is visited more often without anyone having to argue for it.
Step 5: assign and train the monitors
ISO 14155 clause 9.2.1 g) asks the sponsor to designate monitors who are independent of the investigation sites. Clause 9.2.4.2 requires monitors to be qualified in good clinical practice through training and experience, knowledgeable on the investigational device, the CIP and the consent process, and trained on the sponsor's monitoring procedures. Their training is documented in the sponsor's files.
Record the monitors' names, their independence and the training record reference in the plan.
Step 6: set how reports, compliance and escalation work
Clause 9.2.4.7 requires every monitoring activity to be documented and reported to the sponsor, with:
the date, the site, the monitor and the people contacted;
what was reviewed;
the follow-up of earlier action items;
significant findings, deviations and conclusions;
the actions recommended to secure compliance.
A copy of the report, or a summary of key findings, goes to the principal investigator in writing.
Set a deadline for the report after each visit, and a deadline for sharing findings with the principal investigator. Then write how compliance is obtained: action items, a follow-up letter, retraining. Finally, write the escalation path for continuous or egregious non-compliance.
ISO 14155 clause 8.2.1 says the sponsor shall consider suspending or terminating a site or investigator if monitoring finds serious or repeated deviations. In the United States, 21 CFR 812.46 requires a sponsor that finds an investigator not complying to secure compliance promptly or stop shipments and end that investigator's participation.
The sponsor's own duties go further. ISO 14155 clause 9.2.3 asks the sponsor to review monitoring reports, follow up the actions, act promptly to secure compliance, and perform and document root cause analysis and corrective and preventive action where non-compliance significantly affects, or could affect, subject protection or the reliability of results.
Step 7: approve the plan and keep it current
Approve the monitoring plan with the CIP and release it under document control. It is a living document. Revise it when the risk assessment changes, when the CIP is amended, or when monitoring shows that the plan's assumptions were wrong: a site with more deviations than expected, a data item that is often wrong, or a safety signal that needs closer watching.
Common mistakes in monitoring plans
A visit schedule with no risk assessment behind it. The plan says "every 8 weeks" and nothing else. An auditor will ask why.
100% source data verification of everything. It looks thorough but spends the monitor's time on low-risk data while consent and safety reports get the same attention as demographics.
Omitting source data verification with no written justification. ISO 14155 requires one.
Monitors who are not independent of the site, or whose training is not recorded.
No escalation path. Findings repeat visit after visit because nobody decided in advance what happens next.
The plan is never revised. The investigation changes; the plan stays at version 1.
Putting it into practice
The Clinical Investigation Conduct Forms Kit turns this route into numbered steps. FORM 0101-CIF is a risk-based monitoring plan with sections for the investigation risks, the extent of source data verification for each critical process, methods and frequency, monitor independence and training, and reporting and escalation. The kit guide (GUIDE-CIF) carries the route from the plan through site set-up, enrollment, safety reporting, deviations and close-out. It comes in ISO 13485 and dual-standard editions and builds on the A.P. Lyon Clinical Investigation Procedure (SOP 7-039 or SOP 7-039-C). For the CIP, investigator's brochure and report themselves, see Clinical Investigation Documents: Plan, Investigator Brochure and Report. For what happens when monitoring finds an adverse event or device deficiency, see Adverse Event and Device Deficiency Reporting in Device Clinical Investigations.
Frequently asked questions
Does ISO 14155 require on-site monitoring?
In general, yes. ISO 14155:2026 says on-site monitoring is generally needed throughout the investigation, with centralized monitoring as a complement. Only in exceptional circumstances can the sponsor decide that centralized monitoring with other controls is enough, and then it must justify omitting source data verification.
Who can be a monitor?
Someone designated by the sponsor who is independent of the investigation sites, qualified in good clinical practice, knowledgeable on the device, the CIP and the consent process, and trained on the sponsor's monitoring procedures. The training is documented in the sponsor's files.
Is a monitoring plan required for a U.S. non-significant risk study?
The sponsor of a non-significant risk study must still monitor the investigation under 21 CFR 812.2(b). A written monitoring plan is the clearest way to show how.
Building a complete quality system? Build Your QMS lets you choose ISO 13485 + FDA QMSR, Dual-Standard or ISO 9001:2026 procedures in one place, and applies volume discounts automatically: 20% off 5–9 procedures, 35% off 10–19, 50% off 20–39 and 60% off 40 or more.
Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.
Just getting started? The free Startup Quality Plan shows which procedures you need now, which can wait, and how long they take to put in place.



Comments