top of page

EO Sterilization Validation Under ISO 11135: A Step-by-Step Route From Product Definition to Report

11 hours ago
7 min read

Reviewed by Aaron Lyon, President of A.P. Lyon and former Director of Quality Assurance and International Regulatory, with more than 30 years in medical device quality. Last reviewed November 27, 2026.


Most device makers who sterilize with ethylene oxide (EO) never run a sterilizer. A contract sterilizer owns the chamber and a contract laboratory runs the tests. Yet ISO 11135 still puts the device manufacturer at the centre of the validation: it is the manufacturer who defines the product, decides what the process must achieve, approves the protocols and signs the report. This guide sets out the route in the order the work is done, who usually does each stage, and what "done" looks like.


Each summary of the standard is in our own words and refers to ISO 11135:2014 with Amendment 1:2018. If you want the wider picture first, including radiation and product adoption, see our earlier guide, EO and Gamma Sterilization: Validation, Product Adoption and Load Release.


Who does the work


ISO 11135 clauses 4.1 to 4.4 ask for specified procedures for development, validation, routine control and release, with responsibility given to competent people. Where more than one organization is involved, each party's responsibilities must be written down. In practice that means three parties:


  • The manufacturer: defines the product, its packaging and its microbiological quality, owns the validation file, approves protocols and the report, and releases product.

  • The contract sterilizer: owns the preconditioning area, chamber and aeration area, their IQ and OQ, the cycle and its records.

  • The contract laboratory: runs bioburden tests, biological indicator incubation, tests of sterility and EO residual tests.


Put these responsibilities into the agreements with the sterilizer and laboratory before any testing starts.


Stage 1: Define the product and its hardest location


Clauses 4.2.2, 7.1 and 7.4 make product definition the manufacturer's job. It covers the product, its packaging, how it is presented in the load, and its microbiological quality before sterilization.


Clause 7.1 also asks that product, packaging and load are designed so air can be removed (if applicable), heat, humidity and EO can get in, and EO can get out at the end. Then you must show the process sterilizes the most difficult-to-sterilize location in the product. There are three ways to do that:


  1. Define and validate the process for the new product itself.

  2. Show, with documented reasoning, that it is equivalent to a product already validated.

  3. Use an internal process challenge device (PCD) that challenges the process at least as much as that location.


Products are grouped into product families and processing categories (clauses 3, 7.1.2 and 9.4.1.2). If a new product fits an existing family and is no greater a challenge, you may be able to adopt it rather than validate from scratch. Record the decision and the reasoning either way.


Stage 2: Plan the validation


Before planning numbers, choose how lethality will be shown. Clause 8 allows three approaches: the BI/bioburden approach (Annex A), the overkill approach (Annex B), or an alternative that shows the required sterility assurance level (SAL) is reached. We explain the overkill half cycle in a separate guide.


Clauses 6.1 and 6.2 then ask you to write down the process: the phases (preconditioning if used, the sterilization cycle, aeration if used) and the variables in each. At a minimum these are preconditioning time, temperature, humidity and transfer time; exposure time, temperature, humidity, EO concentration and pressure; and aeration time and temperature. If the sterilizer already has an established process, you do not repeat this step, but you do confirm the variables are in the routine process specification.


Clause 9 is short and strict: validation testing does not start until procedures and protocols are approved. Approve the master plan and each protocol first, then test.


Stage 3: Know the bioburden


The microbiological quality of what you send to the sterilizer must be controlled (clauses 7.3 and 12.1.1). For single-use devices, bioburden is estimated at a defined interval under ISO 11737-1. Two points matter at this stage. First, validate the bioburden method before you rely on its numbers. Second, test enough lots to know both the typical count and the kinds of organism present. EO does not destroy bacterial endotoxins, so endotoxin control is a separate question.


Stage 4: Accept the sterilizer's IQ and OQ


The sterilizer usually holds the installation and operational qualification. Your job is to ask for the evidence and judge it. Clauses 9.1 to 9.3 call for:


  • IQ: equipment and ancillary items meet their design specification and safety standards and are installed to the drawings; operating procedures cover step-by-step operation, fault conditions and the action to take, maintenance and calibration; test instrument calibration is confirmed before IQ.

  • OQ: calibration of every instrument that monitors, controls, indicates or records the process is confirmed before OQ, and the installed equipment is shown to meet its operating specification.


Clauses 6.3.1 to 6.3.5 add the equipment specification. Control or monitoring software must be validated. A control failure must not be able to make an ineffective process look effective. The standard gives independent control and monitoring systems, or a cross-check between them, as examples. If an item is missing, ask the sterilizer to close it before PQ starts.


Stage 5: Microbiological PQ


Microbiological PQ (clause 9.4.2) is done in the production chamber, with parameters that deliver less lethality than the routine process. It confirms that the process works for your product and load. Biological indicators go into PCDs. Clauses 8.6 and 8.7 require that the indicators are at least as resistant to EO as the product bioburden and that the PCD challenges the process at least as much as the natural bioburden at the hardest location.


What counts as a pass depends on the approach. With the overkill half cycle, no internal PCD may be positive. Positive external PCDs are acceptable if they are shown to be more resistant than the internal ones. With the BI/bioburden or cycle calculation approach, some internal PCDs may survive, but the calculated SAL must still meet the specified value.


Stage 6: Physical PQ


Physical PQ (clause 9.4.3) shows the full routine process meets its acceptance criteria throughout the load and is reproducible. It needs at least three planned qualification cycles, consecutive in the same study, all meeting the criteria. If the PPQ runs alongside at least three MPQ runs, at least one more run uses the full routine process.


A failure unrelated to process effectiveness, such as a loss of power or services, or an external monitor failure, can be documented without restarting the count. Record it as unrelated, with the reason.


From the PPQ data you set the routine limits: minimum product entry temperature; load temperature and humidity at the end of preconditioning and conditioning; maximum transfer time; EO admission, pressure rise and EO quantity or concentration; chamber conditions during the cycle; and load temperature during exposure and aeration.


Stage 7: Product, safety and residuals


Clause 7.2 asks that product and packaging still meet their safety, quality and performance requirements after the process run at the tolerances with the greatest impact on them. If you allow more than one sterilization cycle, test the effect of repeated cycles. Biological safety after EO exposure is established under the applicable ISO 10993 parts, and EO residuals must be reduced so product meets ISO 10993-7. The residual results then set the minimum aeration time.


If saleable product is used in the validation (clause 11.4), set its release requirements before validation starts. Saleable product used in MPQ needs a full-exposure process and a formal review before it can be released to market.


Stage 8: Review and report


Clause 9.5 asks that all product definition, process definition, IQ, OQ and PQ data, including BI incubation results, are reviewed and the review is recorded. The validation report, approved by the designated responsible person, describes or references the qualified product, the load configurations and the process specification. It covers every variable from minimum product entry temperature through vacuum levels, EO injection and evidence of admission, exposure time, flushing, and aeration time, temperature and air change rate.


Out of the report comes the routine process specification, with parameters, tolerances and the criteria for releasing each load as conforming. If you plan parametric release, the report must state the values and tolerances to be met, including directly measured chamber humidity during conditioning.


Stage 9: Release every load and keep it validated


For every cycle, the sterilizer records data showing the specification was met (clauses 10.1 to 10.4). Load release (clauses 11.1 to 11.3) needs documented criteria: the routine data meet the specification and no biological indicator, if used, shows growth. Chemical indicators never replace biological indicators for release. If a criterion is not met, the product is nonconforming. After a positive BI, a passing product test of sterility cannot be used to release it.


Clause 12.3 then asks for an annual review of IQ, OQ, PQ and later requalifications to decide how much requalification is needed, including whether the SAL must be reconfirmed microbiologically. Changes to product, equipment or process are assessed for their effect before they take effect (clause 12.4).


How the A.P. Lyon kit fits


The EO Sterilization Validation Kit turns these stages into 3 procedures and 10 forms written as numbered steps, each with an owner, the record to fill in and the clause reference in a separate column. It includes a product family and PCD record, the validation master plan, bioburden and sterility records, an IQ and OQ evidence review, microbiological and physical PQ protocols and reports, a product and residuals record, and the validation report with annual review and change review. It works alongside the Ethylene Oxide Sterilization Validation Procedure and the Sterile Load Preparation and Release procedure in our Manufacturing Plus systems.


Frequently asked questions


Who signs the EO validation report, the sterilizer or the manufacturer?


ISO 11135 asks for approval by the designated responsible person and for each party's responsibilities to be specified. In a contract arrangement, write down who that is. In the A.P. Lyon kit, the manufacturer's Quality Manager approves the report, using the sterilizer's and laboratory's data.


Can I skip IQ and OQ if the sterilizer has already done them?


You do not repeat them, but you review the evidence. Clause 9.3 allows IQ and OQ to be a one-time exercise for the specific equipment.


How many PPQ runs are needed?


At least three consecutive planned cycles in the same study, all meeting the acceptance criteria.


Can chemical indicators be used to release a load?


No. Clauses 8.8 and 10.4 say chemical indicators never show the SAL was reached and never replace biological indicators for release.


Building a complete quality system? Build Your QMS lets you choose ISO 13485 + FDA QMSR, Dual-Standard or ISO 9001:2026 procedures in one place, and applies volume discounts automatically: 20% off 5–9 procedures, 35% off 10–19, 50% off 20–39 and 60% off 40 or more.


Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.


Just getting started? The free Startup Quality Plan shows which procedures you need now, which can wait, and how long they take to put in place.

Comments


bottom of page