Design Control Video: What Should Be Ready Before Device Release
Updated: 1 day ago
Reviewed by Aaron Lyon, President of A.P. Lyon and former Director of Quality Assurance and International Regulatory, with more than 30 years in medical device quality. Last reviewed November 10, 2026.
What should be ready before releasing a medical device? Watch Aaron Lyon explain how configuration, design evidence and release approvals connect.
Approximately 43 seconds. Narration recorded by Aaron Lyon.
Written summary
Start with the exact product configuration and intended market. Connect design reviews, verification and validation results, risk decisions, transfer records, and the release approvals required for that device and market.
A checklist helps reviewers locate the evidence. A checked box does not replace that evidence. Before approval, check that the records support the configuration you intend to release.
A release-readiness evidence map
Use this map to check that every part of the release decision points to a record for the configuration you intend to ship. Clause numbers refer to ISO 13485:2016, which FDA's QMSR incorporates by reference.
Question at release | Evidence a reviewer should be able to find | ISO 13485:2016 |
Exactly what are we releasing? | Approved design outputs at stated revisions, including labeling, packaging and any software version, and the medical device file they belong to. | 4.2.3, 7.3.4 |
Do the requirements reflect the intended use and each target market? | Approved design inputs, including the regulatory requirements of every market in the release. | 7.3.3 |
Do the outputs meet the inputs? | Verification protocols and reports traced to each input, run on the released configuration or with a documented rationale for equivalence. | 7.3.6 |
Does the device meet user needs? | Validation on initial production units or their equivalent, including usability and clinical evaluation where they apply. | 7.3.7 |
Are the residual risks acceptable? | A risk management file with residual-risk and benefit-risk conclusions that match the final design. | 7.1 |
Can production make it consistently? | Design transfer records, process validations, approved specifications and inspection methods. | 7.3.8, 7.5.6 |
Were reviews held and changes controlled? | Design review records, and change records showing each change since verification was assessed. | 7.3.5, 7.3.9 |
Who approved release, and for which markets? | A signed release approval, with the marketing authorization status for each market, such as a 510(k) clearance, CE certificate or Canadian licence. | Market regulations |
An empty row means the release is not ready, whatever the checklist says. The most common weak point is evidence produced on an earlier configuration that was never assessed against later changes.
Explore the original procedure examples
The accompanying Design Control guide shows selected excerpts from SOP 7-001 revision 3, effective September 19, 2026, including the design process flow and product approval fields. These are examples of the procedure and form structure, not completed device evidence.
Related documents
Use the full guide to compare the document scope with your project. The video is an educational overview; it does not establish that a device is ready for release or that its regulatory requirements have been met.
Building a complete quality system? Build Your QMS lets you choose ISO 13485 + FDA QMSR, Dual-Standard or ISO 9001:2026 procedures in one place, and applies volume discounts automatically: 20% off 5–9 procedures, 35% off 10–19, 50% off 20–39 and 60% off 40 or more.
Not sure where your quality system stands? Take the free QMS gap check: about 20 questions, an instant report of your gaps by clause, and the procedures that close each one.
Just getting started? The free Startup Quality Plan shows which procedures you need now, which can wait, and how long they take to put in place.
Comments