Measurement Management Kit | ISO 10012
13 procedures, forms and lists that take a company step by step from "we calibrate our gauges" to a measurement management system under ISO 10012:2026, covering which measurements matter, measurement process design, uncertainty budgets and decision rules, traceability, confirming equipment against the measurement need, risk-based calibration intervals, out-of-tolerance impact on product, and the yearly system audit.
Quick facts
Product: Measurement Management Kit
Written to meet: ISO 10012:2026; also references ISO 9001:2026, ISO 13485:2016 and ISO/IEC 17025:2017
For: medical device makers, ISO 9001 companies whose customers ask for ISO 10012, and companies with in-house test laboratories that already run a calibration system
Contents: 13 documents, including a critical measurement list and risk rating workbook, a measurement uncertainty budget workbook, a measurement process design record, a metrological confirmation record, a calibration interval review, an out-of-tolerance impact assessment, a system audit checklist and an ISO 10012 requirements matrix
Format: editable Microsoft Word and Excel files with PDF copies, in two editions (ISO 13485 and dual-standard procedure numbers), digital download
Price: $395 for a single-site license; $1,185 for a consultant license to use with clients
A calibration certificate shows that an instrument was checked. It does not show that the measurement you make with it is good enough for the decision you make with the result. ISO 10012 asks you to know which measurements matter, design each one, know its uncertainty, confirm equipment against what the measurement needs, set intervals from history and risk, and act when something is out of tolerance. This kit turns that into a course of action. Every procedure step names who does it, which form to fill in and where to go next, with clause references kept in a separate column.
Measurement Management System Procedure (SOP 7-101-MMS) with the Critical Measurement List and Risk Rating (FORM 0101-MMS, Excel): scope, policy, the Measurement Management Representative, objectives, resources, rating every measurement by consequence and likelihood, release of results, indicators, audit and management review.
Measurement Process Design and Uncertainty Procedure (SOP 7-102-MMS) with the Measurement Process Design Record (FORM 0102-MMS) and Measurement Uncertainty Budget (FORM 0103-MMS, Excel): metrological requirements from the tolerance, design inputs, decision rules and guard bands, an uncertainty budget that calculates the ratio to tolerance and the guard-banded acceptance limits, traceability, verification and first use.
Metrological Confirmation and Interval Review Procedure (SOP 7-103-MMS) with the Metrological Confirmation Record (FORM 0104-MMS) and Calibration Interval Review (FORM 0105-MMS): what to ask the laboratory for, comparing as-found results with the measurement need, restricted use, checks between calibrations, and lengthening or shortening intervals.
Out-of-Tolerance Investigation and Product Impact Procedure (SOP 8-101-MMS) with the Out-of-Tolerance Impact Assessment (FORM 0106-MMS): stopping use, tracing every affected result, product decisions, telling customers in time, and corrective action.
Measurement Management System Audit Checklist (FORM 0107-MMS), the ISO 10012:2026 Requirements Matrix (LIST 0101-MMS) and the Measurement Management Kit Guide (GUIDE-MMS), with a 9-stage road map, a worked example and a cross-reference to your own procedures.
Who it is for
Companies that calibrate their equipment and now need to show that their measurements are fit for purpose, whether for a customer that requires ISO 10012, an auditor asking about measurement uncertainty, or a recurring out-of-tolerance problem.
What you receive
An instant download of one zip file with a READ ME and two editions of the kit with the same content: one cites the procedure numbers of the ISO 13485 Manufacturing Plus system (for example SOP 7-009), the other the dual-standard ISO 9001 + ISO 13485 system (for example SOP 7-009-C). Each edition has 1 guide, 1 requirements matrix, 4 procedures and 7 forms as editable Microsoft Word and Excel files, with a PDF copy of each.
Works with your quality system
The kit builds on the Calibration System Procedure (SOP 7-009) and Calibration Request (FORM 0013) of the MDSAP-Ready ISO 13485 QMS Manufacturing Plus and MDSAP-Ready QMS Manufacturing Plus systems, and does not replace them. If you use a different system, the guide's cross-reference table has a column for your own procedure numbers.
Related guides
ISO 10012:2026 Measurement Management Systems: A Step-by-Step Route
Measurement Uncertainty Budgets and Decision Rules Under ISO 10012
Calibration Intervals and Out-of-Tolerance Impact Under ISO 10012
Not sure this is the right package? Take the free QMS gap check: answer about 20 questions and see your gaps by clause, the procedures that close each one, and whether a complete system or individual procedures costs less.
Keep your system current: the A.P. Lyon Update Service
Standards and regulations change. With the Update Service, you don't have to track those changes yourself. Every quarter, subscribers get a standards update bulletin and any revised documents for their system, posted to a subscriber-only Update Library on this site. $149 per year per system, or $449 per year for consultants. Renews yearly; cancel anytime. See the plans and add one to your cart
