Preventive Maintenance Procedure | ISO 9001:2026 + ISO 13485:2016
Plan and document preventive and unscheduled equipment maintenance, overdue work, impact assessment and return to service. This editable preventive maintenance procedure is part of the A.P. Lyon Dual-Standard QMS family for ISO 9001:2026 and ISO 13485:2016.
Building a set? Use Build Your QMS to choose 5–9 procedures for 20% off, 10–19 for 35%, 20–39 for 50%, or 40+ for 60%. Discounts are applied at checkout.
Scope and intended use
This procedure applies to manufacturing, inspection, testing and ancillary equipment whose maintenance, condition or failure can affect product conformity, process control or the validity of measurement. Include controlled environment systems and equipment placed in storage or returned to service as applicable.
What you receive
One digital ZIP containing the editable SOP 7-016-C Word procedure and a PDF copy. The gallery shows representative pages from the document.
Additional editable files included in this ZIP:
FORM 0015-C.docx
Using an eQMS? These editable Microsoft Office files can be imported into any electronic quality management system (eQMS) that manages Word and Excel documents, or used in a paper-based system. Adapt the approval, signature and record steps to your system’s workflow, and validate the eQMS software under your own QMS. See how to use A.P. Lyon procedures in an eQMS.
Systems containing this procedure
A system package includes this procedure with other documents. Review its content list before purchasing both.
Before implementation
Adapt responsibilities, process steps, acceptance criteria and records to your organization, device and intended markets. Confirm the applicable standards and regulatory requirements before approval and use. This download supplies documentation, not executed testing, regulatory authorization or certification.
